How to Make Construction Project Profile and agreement with client

 BASIC SCHOOL DEVELOPMENT LIMITED
House No. 10, Road No. 01, Gulshan, Dhaka.


 PROJECT PROFILE

of

Basic School Tower


Prepared By
__________________________________
Contact Management Department
BASIC SCHOOL DEVELODEVELOPMENT LIMITED

House No. 10, Road No. 01, Gulshan, Dhaka.

 

 

 

BASIC SCHOOL DEVELOPMENT LIMITED
House No. 10, Road No. 01, Gulshan, Dhaka.

 

 

PROJECT   PROFILE  OF   Basic School Tower

 

(1)  Name of The Project          :  Basic School Tower

 

(2)  Project Code                      : P65NR.

 

(3) Address of Project               : 720, South Road, Dhanmondi, Dhaka.

 

(4) Type of Building                  : Residential Apartment

 

(5) Storey of Building                : 06.

 

(6) No. of Apartment                : 20 nos.

 

(7) No. of Parking                     : 20 nos.

 

(8) Type of Apartment in details :

 

Type

A

( North -East )

B

( North-West)

C

( South-West )

D

( South-East )

Remarks

Floor

 

5th  Floor

1680 sft

1670 sft

1370 sft

1435 sft

 

4th  Floor

1680 sft

1670 sft

1370 sft

1435 sft

 

3rd  Floor

1680 sft

1670 sft

1370 sft

1435 sft

 

2nd  Floor

1680 sft

1670 sft

1370 sft

1435 sft

 

1st  Floor

1530 sft

1555 sft

1510 sft

1560 sft

 

Ground Floor

Car Parking ( 20 nos. )

 

(9) Area in sft                          :

 

(a) Land Area                           :  7200  sft. ( 10 Katha )

 

(b) Area of Apartment              :  30775 sft.

 

(c) Construction Area               :  36745  sft.

 

(d) Saleable Area                     :  21270 sft. 

 

(10) Consultant   :

CONSULTANT

NAME

ADDRESS

PHONE NO.

ARCHITECTURAL

Architect Ml Islam

xxyz

Phone no. xxx, Mobile no. 0171-XXXXX

STRUCTURAL

(1) Engr. Abul khan

(2) Engr. Abul mia

 

xyz

Phone no. xxx

 Ext. 1504, Mobile no. XXXX

PLUMBING

Mr. kyl alam

xyz

Phone no. xxx

ELECTRICAL

In-house design

 

(11) Owner of Land                              :  Mrs. Sanjida.

 

(12) Tentative Project Value                 :  675.50 Lacs.

 

(13)  Construction work starting date    :   July 2005.  

 

(14)  Date of Hand Over of Project          :  May 2007. 

 

(15)  Existing building demolishing date : 01/05/05 to 03/07/05.

 

(16) Plan Approval Date                        :  05/05/05.

 

(17) Date of MOU                                 :  N/A.

 

(18) Date of Agreement                        : 18/01/05.

 

(19) Date of Baina                                : N/A.

 

(20) Date of Sale (Registration)            : N/A.

 

(21) Date of Power of Attorney             : 14/05/05.

 

(22) Date of Approval of Power of Attorney : N/A.

 

(23) Terms of Developments ( Self or Joint Venture) : Joint Venture.

 

(24) Distribution of Apartment ( if Joint Venture )  : L/O : ADL = 06 : 14.

 

 

LAND OWNER

ADL

Type

A

(North -East )

(1680 & 1530 sft )

B

(North-West)

(1670 & 1555 sft )

C

( South-West )

(1370 & 1510 sft )

D

( South-East )

(1435 & 1560 sft )

A

(North -East )

(1680 & 1530 sft )

B

(North-West)

(1670 & 1555 sft )

C

( South-West )

(1370 & 1510 sft )

D

( South-East )

(1435 & 1560 sft )

Floor

 

5th  Floor

 

-

-

-

-

ADL

ADL

ADL

ADL

4th  Floor

 

-

-

-

-

ADL

ADL

ADL

ADL

3rd  Floor

 

-

-

-

-

ADL

ADL

ADL

ADL

2nd  Floor

 

L/O

 

-

L/O

-

ADL

ADL

 

1st  Floor

L/O

L/O

 

L/O

L/O

-

-

-

-

Ground Floor+

 

Car Parking ( 20 nos.)

 

(25)   Material Specifications    :

 

(a)  CIVIL WORKS :

 

Sl. No.

Name of Item  (Individual feature)

Specification

Remarks

           GROUND FLOOR

 

 

 1

 Boundary wall

 

 

 1.1

 Main Entrance Gate

M.S.

 

 1.2

 Pocket Gate

M.S.

 

 1.3

 Boundary safety grill

M.S. Flat Bar

 

 1.4

 Boundary wall

 M.S. Box grill & Brickwork

 

 1.5

 Project name with logo

Polished Marble / Granite

 

 2

 Car parking area

 

 

 2.1

 Car park marking

Enamel Paint / Ceramic Bricks 

 

 2.2

 Marking number plate

 Acrylic / Plywood/M.S./S.S.

 

 2.3

 Car washing area

 Pavement tiles

 

 2.4

 Drive way

 Pavement tiles

 

 2.5

 Column protection

 M.S. Angle / Flat Bar

 

 2.6

 Wheel Guard

Concrete

 

 3

 Landscaping work

Grass, Plants etc. 

 

 4

 Walk way

 Pavement tiles/ block / Ceramic bricks

 

 5

 Reception & Waiting room

 

 

 a)

 Front desk top

Marble finished concierge desk

 

 b)

 Floor 

Homogeneous floor Tiles R.A.K. (12” X 12”)

 

 c)

 Wall

Plastic paint

 

 d)

 Window with grill

Aluminium window &

M.S. Grill with flat bar (5mm)

 

 e)

 Visitor's sitting

 

 

 f)

 Toilet

 

 

 f.1)

 Floor Tiles

 Ceramic floor tiles (R.A.K.) 12” X 12”

 

 f.2 )

 Wall Tiles

Ceramic tiles (R.A.K.) 8” X 12”

 

 6

 Mail box in Lobby area

Plywood  

 

 7

 Duct Cover

Plastic Wood

 

 8

 Drivers’ sitting

 Ceramic floor tiles (R.A.K.) 12” X 12”

 

 9

 Generator room/Sub-station room &

 Pump room

 

 

 9.1

 Floor

NCF

 

 9.2

 Wall

Plastic Paint

 

 9.3

 Guard room

Moderate Finish

 

     LIFT LOBBY AND STAIR

 

 

 1

 Ground floor lift lobby

Marble / Granite finish

 

 2

 Lift Lobby in other floor

Homogeneous Glazed floor tiles (RAK) 12” X 12”

 

 3

 Lift Walls in Ground floor

Marble / Granite finish

 

 4

 Lift wall in other floor

Ceramic Tiles (R.A.K.)

 

 5

 Stair nosing

Glazed Homogeneous nosing stair tile

 

 6

 Top of Railing (handrail)

Wooden hand rail

 

 7

 Railing & post

M.S.Pipe / Box

 

      ROOF TOP

 1

 Overhead water tank

R.C.C.

 

 2

 Planter

Grass, Plants

 

 3

 Lift Machine room

NCF

 

 4

 Roof treatment

Avg. 4” thick lime terracing

 

 5

 Parapet Wall

Brickwork  & M.S. Box Railing

 

 6

 Cloth drying

M.S. Pipe

 

 7

 Community Hall Room

Ceramic floor tiles (R.A.K.) 12” X 12”

 

 8

 Toilet

Ceramic tiles (R.A.K.)

 

  IN  EACH APARTMENT

 

 1)

 DOORS :

 

 

 1.1

 MAIN DOOR

 

 

 1.1.1

 Apartment Number Plate

Plastic 

 

 1.1.2

 Door Frame

Solid Teak (Decorative)

 

 1.1.3

 Door Shutter

Ctg Teak Wood

 

 1.1.4

 Handle Lock

Orlando / Rossitti (Italy)

 

 1.1.5

 Cylindrical Lock

China

 

 1.1.6

 Door chain

China

 

 1.1.7

 Check viewer

China

 

 1.1.8

 Door knocker

China

 

 1.1.9

 Tower Bolt

8 ” Brass

 

 1.1.10

 4 ” Hinge with screw

Brass Flora (India)

 

 1.2

 INTERIOR DOOR

 

 

 1.2.1

 Door Frame

Mehagini / Shilkorai or equivalent

 

 1.2.2

 Door Shutter

Chapalish veneered

 

 1.2.3

 Door lock/ mortise lock

Jens (China)

 

 1.2.4

 Tower Bolt

6 ” Brass (India )

 

 1.2.5

 Hinge with screw

Antic (China)

 

 1.2.6

 Buffer Block

Rubber

 

 1.3

 CAT DOOR

 

 

 1.3.1

 Door Frame

Mehagini / Shilkorai or equivalent 

 

 1.3.2

 Tower Bolt

Alu- 4”

 

 1.3.3

 Door Shutter

 Chapalish Veneered board

 

 1.3.4

 Hinge with screw

Antic (China)

 

 1.3.5

 Roller case

Taiwan

 

 1.3.6

 Knob

Wooden knob

 

 1.4

 VERANDAH DOOR

 

 

 1.4.1

 Door Frame

Mehagini / Shilkorai or equivalent

 

 1.4.2

 Door Shutter

Chapalish veneered (1 side lacquered finish)

 

 1.4.3

 Tower Bolt

6” Brass India

 

 1.4.4

 Hinge with screw

Antic (China)

 

 1.4.5

 Door Lock

China

 

 1.4.6

 Buffer block

Rubber

 

 1.5

 TOILET DOOR

 

 

 1.5.1

 Plastic door shutter with frame

Plastic (set)

 

 1.5.2

 Tower Bolt

6” Bruss India

 

 1.5.3

 Hinge with screw

Antic (China)

 

 1.5.4

 Cylindrical Lock

China

 

 1.5.5

 Buffer block

Rubber

 

 1.6

 TOILET DOOR (Servant )

 

 

 1.6.1

 Plastic door shutter with frame

Plastic (set)

 

 1.6.2

 Handle

Antic (China)

 

 1.6.3

 Tower Bolt

Aluminium

 

 2)

 TILES & MARBLE WORK

 

 

 2.1

 Floor

 

 

 2.1.1

 Bedroom-01 with skirting

Non-Glazed Ceramic R.A.K. or equivalent (12 “ x 12 “ )

 

 2.1.2

 Bedroom-02 with skirting

Non-Glazed Ceramic R.A.K. or equivalent (12 “ x 12 “ )

 

 2.1.3

 Bedroom-03 with skirting

Non-Glazed Ceramic R.A.K. or equivalent (12 “ x 12 “ )

 

 2.1.4

 Living room with skirting

Non-Glazed Ceramic R.A.K. or equivalent (12 “ x 12 “ )

 

 2.1.5

 General Floor with skirting

Non-Glazed Ceramic R.A.K. or equivalent (12 “ x 12 “ )

 

 2.1.6

 Kitchen with skirting

Non-Glazed Ceramic R.A.K. or equivalent (12 “ x 12 “ )

 

 2.1.7

 Verandah with skirting

Non-Glazed Ceramic R.A.K. or equivalent (12 “ x 12 “ )

 

 2.1.8

 Bathroom floor

Non-Glazed Ceramic R.A.K. or equivalent (12” X 12”)

 

 2.1.9 

 Servant’s Bath

Non-Glazed Ceramic R.A.K. or equivalent (12” X 12”)

 

 2.2

 Wall

 

 

 2.2.1

 Toilet-01

Ceramic Glazed R.A.K. or equivalent (8 “ x 12 “ )

 

 2.2.2

 Toilet-02

Ceramic Glazed R.A.K. or equivalent (8 “ x 12 “ )

 

 2.2.3

 Toilet-03

Ceramic Glazed R.A.K. or equivalent (8 “ x 12 “ )

 

 2.2.4

 Any Room

Ceramic Glazed R.A.K. or equivalent (8 “ x 12 “ )

 

 2.2.5

 Kitchen

Ceramic Glazed R.A.K. or equivalent (8 “ x 12 “ )

Upto 7’ height

 2.2.6

 Kitchen work top

Ceramic Glazed R.A.K. or equivalent (8 “ x 12 “ )

 

 2.2.7

 Basin Counter top

Ceramic Glazed R.A.K. or equivalent (8 “ x 12 “ )

 

 2.2.8

 Servant’s Bath

Ceramic Glazed R.A.K. or equivalent (8 “ x 12 “ )

Upto 5’ height

 2.3

 EXTRA CIVIL WORK

 

 

 2.3.1

 False ceiling floor

NCF

 

 2.3.2

 A.C. Duct

 

 

 2.3.3

 Exhaust Fan Duct

 

 

 2.3.4

 Washing area in Kitchen Verandah

Ceramic Tile Finish

 

 2.3.5

 Exterior surface (partially)

Facing Bricks

 

  3)  GRILL & RAILING WORK IN APARTMENT

 

 3.1

 Window grill

M.S Flat bar of 5 mm thick.

 

 3.2

 Verandah grill

M.S Flat bar of 5 mm thick.

 

 3.3

 Verandah railing

M. S. Box  

 

 3.4

 Railing at Parapet wall (partially)

M.S. Box above 12” brickwork.

 

 4) ALUMINIUM WORK IN APARTMENT

 

 4.1

 Sliding window

4” BTA  ( 5 mm thickness clear glass)

 

 4.2

 Mosquito proof net

Provision 

 

 4.3

 Sliding door in Verandah

4” BTA section with Mosquito net provision

 

 5) PAINTING IN GROUND FLOOR

 5.1

 Ground floor painting

Plastic Paint ( Berger/ Aqua )

 

 5.2

 Exterior wall (partially)

Weather coat /Master coat  ( Berger/Aqua )

 

 5.3

 Paint in stair room

 Plastic Paint ( Berger/ Aqua ) 

 

 5.4

 Window/Verandah grill & railing

Synthetic Enamel Paint

 

 6) PAINT WORK IN APARTMENT

 6.1

 Interior wall

Plastic Paint ( Berger/Aqua /Asia)

 

 6.2

 Ceiling

Distemper (Berger/Aqua)

 

 6.3

 Exterior wall

Weather coat /Master coat  ( Berger/Aqua )

 

 6.4

 Metal

Enamel Paint ( Elite/ Aqua )

 

 6.5

 Bath room ceiling

Plastic Paint ( Berger/Aqua/Asia )

 

 6.6

 Above False ceiling (in side)

Distemper (Berger/Aqua/Elite)

 

 7) POLISH WORK IN APARTMENT

 7.1 

 Main door with frame & shutter

French Polish

 

 7.2

 Internal door with frame & shutter

French Polish

 

 7.3

 Verandah door with frame & shutter

French Polish (one side lacquered)

 

 7.4

 Railing top (hand rail)

French Polish

 

 8)

 Miscellaneous (if any) 

 

 

 

 

 

 

 

 

 

 

 

( b) ELECTRICAL WORKS   :

 

Sl. No.

Name of Item (Individual Feature)

Specification

Remarks

 ELECTRICAL WORK IN GROUND FLOOR

1 )

 Lighting arrangement

 

 

1.1

 Security light

Crescent / Swash

 

1.2

 Boundary light (ornamental)

Crescent / Swash

 

1.3

 Gate light

Crescent / Swash

 

1.4

 Car parking light

Crescent / Swash

 

1.5

 Name plate/ logo light

Crescent / Swash

 

1.6

 Saucer/ Spot light for staircase

Crescent / Swash

 

1.7

 Wall Bracket light

Crescent / Swash

 

1.8

 Tube light at Party room

Crescent / Swash

 

 2 )  ELECTRO-MECHANICAL WORK IN COMMON AREA

 2.1

 Sub-station installation

 Local 

 

 2.1.1

 Transformer  (250 KVA)

Local

 

 2.1.2

 H.T.Meter

Local

 

 2.1.3

 L.T.Panel

Local

 

 2.1.4

 PFI Panel (150 KVAR)

Local

 

 2.1.5

 H.T.Panel

Local

 

 2.1.6

 Dropout fuse

Local

 

 2.1.7

 Lighting arrester for sub-station

Local

 

 2.1.8

 H.T.Cable laying

Local

 

 2.1.9

 L.T.Cable laying

Local

 

 2.1.10

 Energy Meter

Local

 

 2.1.10.1

 3-Phase

DESA Standard

 

 2.1.11

 Earthing for sub-station

 

 

 2.1.12

 Fire bucket

2 nos.

 

 2.2

 Sub-station room

Moderate Finish

 

 2.3

 Generator (40 KVA) installation

Parkins/Dautz/equivalent

 

 2.4

 Changeover switch

Foreign

 

 2.5

 Generator room

 

 

 2.6

 Fire extinguisher

2 nos. Local

 

 2.7

 Lighting arrester for building

As per DESA Standard

 

 2.8

 Earthing for building

 

 

 2.9

 Lift Installation

LG -Ottis or equivalent

 08 Persons

 2.10

 Voltage Stabilizer Provision

 

 

 2.11

 IPS Provision

 

 

 2.12

 Electrical  Fittings &  Fixtures

 

 

 2.12 .1

 M.K.Type Switch

 

 

 2.12.1.1

 Piano switch

China

 

 2.12.1.2

 1 Gang Switch

China or Equivalent

 

 2.12.1.3

 2 Gang Switch

China or Equivalent

 

 2.12.1.4

 3 Gang Switch

China or Equivalent

 

 2.12.1.5

 4 Gang Switch

China or Equivalent

 

 2.12.1.6

 5 Gang Switch

China or Equivalent

 

 2.12.1.7

 20A  DP Switch

China or Equivalent

 

 2.12.1.8

 5A to 15A Tumbler Switch

Local /India

 

 2.12.1.9

 Bell push

China or Equivalent

 

 2.12.2

 M.K. Type Socket

 

 

 2.12.2.1

 5A- 2 pin (combined)

China or Equivalent

 

 2.12.2.2

 13A- 3 pin (combined)

China or Equivalent

 

 2.12.2.3

 15A- 3 pin (combined)

China or Equivalent

 

 2.12.2.4

 MK Dimmer

China or Equivalent

 

 2.12.2.5

 Telephone Outlet 

China or Equivalent

 

 2.12.2.6

 Dish Antenna Outlet

China or Equivalent

 

 2.12.2.7

 5A to 15A Tumbler socket

Local / India

 

 2.12.3

 PVC Conduit

Water grade/ Normal grade

 

 2.12.4

 CABLE

 

 

 2.12.4.1

 Telephone cable

BRB / Paradise or Equivalent

 

 2.12.5

 PABX

Panasonic

 

 2.12.6

 DISH CABLE 

RG-6 USA

 

 2.12.7

 FAN

 

 

 2.12.7.1

 Ceiling Fan with Hook

Local

 

 2.12.7.2

 Exhaust Fan (12 ” )

China

 

 2.12.8

 SDB  Box

Local

 

 2.12.8.1

 MDB  Box

Local

 

 2.12.8.2

 EMDB  Box

Local

 

 2.12.9

 CIRCUIT BREAKER

 

 

 2.12.9.1

 MCB

LG (Korea) or equivalent

 

 2.12.9.1.1

 SP-3A/6A/10A/16A/20A/30A/40A/50A

LG (Korea) or equivalent

 

 2.12.9.1.2

 DP –16A/20A/40A/50A/63A

LG (Korea) or equivalent

 

 2.12.9.1.3

 TP MCB – 20A/32A/40A/50A/63A

LG (Korea) or equivalent

 

 2.12.9.1.4

TP MCCB-25/32/40/63/80/100/150/450A

LG (Korea) or equivalent

 

 3)

MISCELLANEOUS (if any)

 

 

 

 

 

 

 

(C ) SANITARY & PLUMBING WORKS :

 

Sl. No.

Name of Item  (Individual feature)

Specification

Remarks

 1) SANITARY WORK IN GROUND FLOOR

 1.1

 Water pump with control panel

Pedrollo / Saer or equivalent

 

 1.2

 Underground water tank

R.C.C.  

 

 2) SANITARY FITTINGS & FIXTURES IN APARTMENT

 

 2.1

 Bath tub

Acrylic (China) 

 

 2.2

 Bath tub mixture

 Nazma Metal / Gloria  or equivalent

 

 2.3

 Sink

Malaysia / Pakistan

 

 2.4

 Sink mixture

Nazma Metal / Gloria  or equivalent

 

 2.5

 Basin mixture

Nazma Metal / Gloria  or equivalent

 

 2.6

 Connection pipe

Local

 

 2.7

 Combiset

R.A.K. or equivalent

 

 2.8

 Pedestal basin

R.A.K. or equivalent

 

 2.9

 Cabinet basin

R.A.K. or equivalent  

 

 2.10

 Push shower

China or equivalent

 

 2.11

 Head shower / Moving shower

Nazma Metal / Gloria  or equivalent

 

 2.12

 Angle stop cock

Nazma Metal / Gloria  or equivalent

 

 2.13

 Conceal stop cock

Nazma Metal / Gloria  or equivalent

 

 2.14

 Bib cock

Nazma Metal / Gloria  or equivalent

 

 2.15

 Pillar cock

Nazma Metal / Gloria  or equivalent

 

 2.16

 Hot & cold water provision

Electrical

 

 2.17

 Grating

Nazma Metal / Gloria  or equivalent

 

 2.18

 Paper holder

Nazma Metal / Gloria  or equivalent

 

 2.19

 Soap case

Nazma Metal / Gloria  or equivalent

 

 2.20

 Towel rail

Nazma Metal / Gloria  or equivalent

 

 2.21

 Mirror

Taiwan / Belgium

 

 2.22

 Long pan

Local

 

 2.23

 Low-down

Local

 

 2.24

 Glass shelf

Nazma Metal / Gloria  or equivalent

 

 2.25

 Gas burner provision

 

 

 2.26

 G.I. Pipe

Hatim / Asia 

 

 2.27

 G.I. Fittings

China

 

 2.28

 Pipe

UPVC/PVC

 

 2.29

 Pipe fittings

UPVC

 

 3 )

 MISCELLANEOUS (if any)

 

 

 

 

 

 

 

 

 

 

 

 

(d) UTILITY CONNECTION :

 

 

Sl. No.

Name of Item  (Individual Feature)

Specification

Remarks

 a)

 DESA (Electricity )

08 KW for each apartment

 

 b)

 TITAS (Gas)

02 Point Burner

 

 c)

 WASA (Water supply & sewerage)

Common

 

 

 

(26) Work Schedule      :        Attached to the sheet

 

 

(27) Ground Floor Plan :        Attached to the sheet

 

 

(28)  Typical Floor Plan :         Attached to the sheet

 

 

(29)  Roof Plan             :         Attached to the sheet

 


 

Prepared by            Checked by               Checked by            Checked by            Approved by 

Thank You👇
If you want to get a word file of the format, please comment below and provide your email address, and then you will receive the work file format of Project Profile.
#ProjectProfile #Constructionprojectagrement
Next Post Previous Post
1 Comments
Add Comment
comment url